| Nortel Wireless [Winter 1997] |
| |
| Programmed, setup, and troubleshot system, using Labview to automate Bit Error Rate testing for the base transciever station using CMD 57 test equipment. |
| |
| Assembled and crimped together all cables for 2 full prototype versions of the wireless station so engineers could begin set up immediately. There had been a delay from the contract work to get the cables completed on time. |
|
|
| Helped design small T1 circuit to distribute and amplify a clock signal throughout the develoment lab. |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |