Electronic Systems Engineer

Winter 1997

Nortel Wireless [Winter 1997]
 
Programmed, setup, and troubleshot system, using Labview to automate Bit Error Rate testing for the base transciever station using CMD 57 test equipment.
 
Assembled and crimped together all cables for 2 full prototype versions of the wireless station so engineers could begin set up immediately. There had been a delay from the contract work to get the cables completed on time.

 

Helped design small T1 circuit to distribute and amplify a clock signal throughout the develoment lab.
 
 
 
 
 
 
 
 
 
 
Performed full environmental testing of station in an eco-chamber using thermocouples, and automated log equipment.
 
Documented results of Labview programming, and wrote report of Environmental testing.
 
Presented Labview programs to managers.